The national number, from the federal report
Lawrence Berkeley National Laboratory's 2024 report to Congress is the most careful count available. It puts direct, on-site water consumption by United States data centers at 66 billion liters in 2023 — about 17.4 billion gallons for the year, or roughly 48 million gallons a day. That is a modeled estimate, not a meter reading; no meter exists for the whole industry. The same report counts the water consumed at power plants generating the industry's electricity at nearly 800 billion liters — about twelve times the on-site figure. Hyperscale and colocation facilities account for about 84 percent of the on-site total, and the laboratory projects hyperscale facilities alone could reach 16 to 33 billion gallons a year by 2028.
One facility: the range that matters
Google's own disclosures anchor the facility scale. Its average data center consumed about 450,000 gallons a day in 2021, and the company's total reached about 8.1 billion gallons in 2024 across its data centers and offices — a 28 percent jump in one year. Its Pryor, Oklahoma campus withdrew about 1.1 billion gallons in 2024, close to 3 million gallons a day at one address. Analyses of the largest campuses put the top of the range near 5 million gallons a day. For scale: Tampa Bay Water delivers about 198 million gallons a day to 2.6 million people — about 76 gallons per person per day. A 450,000-gallon-a-day facility drinks what roughly 5,900 Tampa Bay residents use; a 5-million-gallon campus, what roughly 65,000 use.
It is the cooling, not the computers
Servers turn electricity into heat, and the water bill is the price of removing it. Three designs, three very different numbers:
- Evaporative cooling (cooling towers) — the large-facility default. Heat leaves by evaporating water; roughly three quarters or more of the water drawn in is consumed — gone to the sky, not returned to a sewer or a river.
- Air-cooled chillers — near-zero water on site, but more electricity, which moves the water use upstream to the power plant.
- Closed-loop and direct-to-chip liquid cooling — the same water (or fluid) recirculates; makeup water collapses to a small fraction. This is where new artificial-intelligence builds are heading, and it is the design Florida's current fights keep converging on.
The industry measures this with Water Usage Effectiveness — liters of water per kilowatt-hour of computing. The federal report puts the industry average near 0.36, with water-cooled plants without economizers running above 1 and air-cooled plants near zero. When a developer quotes a tiny water number, the cooling design is the first thing to check — and the claim to hold them to.
Florida: the permit is now the battleground
Florida answered this question with a law before it answered it with a crisis. Senate Bill 484 (Chapter 2026-65), signed May 7, 2026 and effective July 1, 2026, created Florida Statutes section 373.262: water management districts and the Department of Environmental Protection may not issue a consumptive use permit to a large-scale data center if the proposed use is harmful to the water resources of the area, districts may require part of the supply to come from reclaimed water, and even a modification of an existing permit is treated as a brand-new application. The same law stops utilities from passing data-center power costs onto household bills.
Two Polk County projects show the law meeting the ground. Near Fort Meade, a proposed campus of about 4.4 million square feet on former phosphate land won city approval in April 2026 but still waits on its water use permit from the Southwest Florida Water Management District; the projected use reported from project documents is up to 50,000 gallons a day — an estimate, and small next to a hyperscale campus, which is exactly the point: the fight is about precedent on a stressed aquifer, not about this one number. In Auburndale, a developer converting two warehouses near Florida Polytechnic University estimates about 4,665 gallons a day on a closed-loop system — less than the site's previous warehouse use — while the city drafts a one-year moratorium on future projects.
What this means for your water
A data center does not drink from your tap directly. It stands in the same permit line as your city, your bottler, and your neighbor's farm — and in Florida that line is managed by your water management district under the rules in Who Owns the Water? The practical questions to ask of any proposed project near you: How many gallons a day, consumed or just withdrawn? Which cooling design? Which aquifer or river, under which permit — and what happens to that number in a drought year, when your own lawn is already down to one watering day a week under the shortage order described in Is Florida Running Out of Water?
Sources
- Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report (December 2024): 66 billion liters direct consumption in 2023; nearly 800 billion liters indirect; hyperscale/colocation share 84 percent; 2028 hyperscale projection 60–124 billion liters; average site Water Usage Effectiveness about 0.36 liters per kilowatt-hour.
- Google environmental disclosures: average facility about 450,000 gallons per day (2021); about 8.1 billion gallons consumed in 2024 (Environmental Report 2025); Pryor, Oklahoma campus about 1.1 billion gallons withdrawn in 2024.
- Environmental and Energy Study Institute 2025 analysis: largest facilities up to about 5 million gallons per day.
- Florida Senate Bill 484 (2026), Chapter 2026-65: Florida Statutes sections 373.203 and 373.262 — data center water permitting, as analyzed by Carlton Fields and Beck law firm summaries of the enacted law.
- Tampa Bay Water, 2025 Supply Overview: 198.47 million gallons per day average delivery, fiscal year 2025; 2.6 million people served.
- Fort Meade and Auburndale project details: City of Fort Meade development agreement reporting and Tampa Bay 28 (WFTS) coverage of the Hillwood Auburndale project, November 2026. The Fort Meade water-use figure is a reported estimate, not a permitted quantity.